The Accidental Person-in-Charge-of-a-Big-Software-Project

You’re a busy Director or VP responsible for an equally busy key department within a large enterprise, and on your plate rests the success or failure of a project to integrate new systems into your business processes.  You’re the accidental person-in-charge.  You didn’t ask for it, or maybe you did, but in any case you […]

One of the Biggest Mistakes: Your Assumptions About the Project

The F-35 Joint Strike Fighter, first conceived in the mid-1990s, is a multi-purpose fighter jet that evades radar and anti-aircraft missiles, can fly at 1,200 mph, and can land vertically. While over 40 planes have been manufactured, the program is way behind schedule and the program’s costs have grown from an initial estimate of $177 […]

One of the Biggest Mistakes is Your Assumptions About the Project

The F-35 Joint Strike Fighter, first conceived in the mid-1990s, is a multi-purpose fighter jet that evades radar and anti-aircraft missiles, can fly at 1,200 mph, and can land vertically. While over 40 planes have been manufactured, the program is way behind schedule and the program’s costs have grown from an initial estimate of $177 […]